DeviceNet Network Installation Checklist

If you are setting up your DeviceNet network or it is not working properly go through the following checklist. It will fix your problem 95% of the time.

  • Termination resistors. ( 1 at each end of trunk ).
  • Grounding of Network. ( One location only ).
  • Cumulative drop line budget in spec. for selected baud rate.
  • Trunk as linear topology. No Star off of trunk > 20 feet ( 6 m ).
  • Spacing guidelines from AC cables.
  • No Drops > 20 feet (6 m).
  • Trunkline budget in spec. for baud rate.
  • Total Network Current Check ( DeviceNet Assistant )
  • Common Mode Voltage Check at network ends, with full load.
  • Voltage and Ohm readings of CAN wires within spec.

(This above notes were taken from the DeviceNet Book of Knowledge by Robert D. Law)

Related posts:

  1. DeviceNet Diagnostic Faceplate For RSView ME (SE)
  2. DeviceNet Thick Cable Communication Media
  3. Siemens joins Algae@Work Alliance Network

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>